|
|||
Design and DevelopmentPhase IPhase 1 is 7.5 hectares. Planning consent for the first homes was obtained in May 1993 following extensive public consultation. Phase 1 includes 196 houses and 56 flats including 55 social housing units rented through the Guinness Trust. Site designed and hosted by || Jump Media
|
|||